Wikipedia:The Wikipedia Adventure/Timeline

From Wikipedia, the free encyclopedia

Phase 0: from concept to construction[edit]

  • Updated project page  Done
  • Facebook and twitter account  Done
  • Prototype interactive elements
    • Tour through signup/register [1]  Done
    • Invitation to play on talk page
    • Creation of talk subpage  Done
    • Receive a message
    • Leave a reply
    • Quiz question  Done
    • Watch a video
    • Summarize a policy  Done
    • Real life editing task [2]
    • Earn a badge  Done
    • Preloads  Done
    • Edit instructions (above editing box, like Teahouse)
    • Userpage TWA userbox (real life: Wikipedia:Userboxes/Gallery)
  • Brainstorm design outlook with moodboard  Done
    • Creative approach  Done
    • Feel, vibe, tone (Easter Egg, Genie Badge)  Done
    • Color, scheme [3][[4][5][6][7][8][9][10]
    • Comparisons (Vector, Teahouse, IdeaLab, outside projects...)  Done
    • Demographics {{done}
    • Moodboard  Done
    • Agreements, funding  Done
  • Connect with E3 team
    • Rules of engagement (I code, they may help guide)  Done
    • Introduction to mailing list  Done
    • Introduction on irc  Done
    • Note to tech lead  Done
    • Note to Guided Tours lead  Done
  • Research literature on game dynamics  Done
    • List inventory of sources in a bibliography using WP:TWA/Research  Done
    • Saved invoices and record expenses  Done
    • Create page to document learnings  Done
    • Read all ordered books  Done
    • Notes on books to Facebook 1-5  Done
    • Notes on books to Facebook 6-10
  • Usability
    • Needfinding interview done and published on Facebook and Wikipedia x3  Done
    • Twine interactive text version interviews done and published on Facebook and Wikipedia x3  Done
  • Script review
    • Twine script  Done
      • Levels 1 and 2  Done
      • Levels 3 and 4  Done
      • Levels 5 and 6 and 7  Done
    • Is anything out of date? If so, update.
  • Technical questions
    • Is autoconfirmed going to be an issue? (no)  Done
  • Travel and conferences  Done
    • confirm scheduling for GSummit  Done
    • purchase ticket to SF  Done
    • meet with Heather and Siko to firm-up design approach  Done
    • Amsterdam Hackathon spring
    • Debugging tutorial with Martijn  Done
    • API automatic edit research  Done
    Open Help conference: "Fun Is Serious Business" talk  Done
  • Documentation
    • Complete and return agreement  Done
  • Testing
    • Message alpha team members (HCI/Gamification/TWA members/Teahouse/designers)
    • Complete 3 needfinding interviews  Done
  • Research
  • possibilities for design expertise (Werbach, McGonigal, Zichermann)
  • Schedule meetings with GSummit sponsors  Done
  • Multimedia
  • Automatic edit userscript  Done
    • Method researched
    • Coded in javascript
  • Artwork integrated
  • Portal  Done
  • Standard background  Done
  • Navigation bar  Done
  • Challenge page  Done
  • Skill meters  Done
  • Avatar
  • Badges
  • Level completion
  • Level construction
    • Level 1  Done
    • Level 2
    • Level 3
    • Level 4
    • Level 5
    • Level 6
    • Level 7
  • Level refinement
    • Level 1
    • Level 2
    • Level 3
    • Level 4
    • Level 5
    • Level 6
    • Level 7
  • Level usability testing
    • Level 1
    • Level 2
    • Level 3
    • Level 4
    • Level 5
    • Level 6
    • Level 7
  • Echo and visual editor updates

Phase 1:From construction to impact[edit]

  • Set up event logging schema
  • Create entry points for game
    • Getting Started option
    • Teahouse links
    • Geonotice
  • Bugfixing from beta version